From the Commissioning screen, select Country & Grid.Unless these settings are selected, the inverter will not start production. The inverter must be configured to the proper settings in order to ensure that it complies with the country grid code and functions. The mobile device creates a Wi-Fi connection with the inverter and displays the main Commissioning screen. Open SetApp and follow the on-screen instructions (scan the inverter QR code, move the ON/OFF/P switch to P position for 2 seconds, and release).If not already ON – turn ON AC to the inverter by turning ON the circuit breaker on the main distribution panel.If the inverter has already been activated and commissioned: During first-time installation: Upon activation completion, in the NetApp, tap Start Commissioning.Menus may vary in your application depending on your system type.
This section describes how to use the NetApp menus for commissioning and configuring the inverter settings. Step 2: Commissioning and Configuring the Installation ▪ Select Start Commissioning for pairing and other system configurations. ▪ Select Connect to Another Device to continue activating additional inverters.
When commissioning is performed, the user is required to set the grid parameters and backup Voltage information (if used). During the activation and commissioning, the inverter discovers and communicates with all connected components in the solar system, such as optimizers, peripheral communication devices, and other linked inverters. Activation and commission of the system are performed using the inverter SetApp mobile application.
7.1 Related Manuals / Resources Chapter 1: Activating, Commissioning, and Configuring the SystemĪfter the solar system is installed, it is important to activate and commission the solar system.